Skip links

Investments

 

KİMPUR DÜZCE PRODUCTION FACILITY

As part of our sustainable growth strategy, we officially inaugurated our second production facility in Türkiye, located in Düzce, in October 2023. The construction of this facility began in 2022. We have commissioned a 30,000-ton capacity section and aim to increase this capacity through new investment projects. Additionally, we plan to synthesize polyol from PET waste with a 5,000-ton capacity at this facility. Once the facility operates at full capacity, we aim to enhance our total production capacity and achieve our goal of becoming one of the top 10 polyurethane system houses in the world.

 

RAVAGO PETROKİMYA A.Ş. COOPERATION

In collaboration with Ravago Petrochemical Inc., the production and sales of polyurethane systems, which were previously carried out at Ravago’s facilities, will now take place at our Düzce production facility. This strategic partnership involves relocating Ravago’s polyurethane machinery to Kimpur’s Düzce facility, adding an extra capacity of 85,000 tons.

 

R&D CENTER INVESTMENTS

We invest in advanced technology devices at our R&D Center and Simulation Laboratory to develop innovative and uncommon solutions and enhance our competitive edge.

Investments Made in 2023

  • Gas Chromatography – Mass Spectrometry
  • R&D Laboratory Stirring Mixer
  • Dissolver Pilot Reactor
  • Laboratory Test Devices, etc.

 

SOLAR ENERGY INVESTMENTS

Gebze Üretim Tesisimizde;

At our Gebze Production Facility:

~ %20 Renewable Energy Target

At our Düzce Production Facility:

With the Solar Power Plant;

~%55 Renewable Energy Target

~ Target to Reduce 679 Tons of Carbon Emissions